Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Overfilled Storage

Status
Not open for further replies.

ugfest

Civil/Environmental
Joined
Mar 10, 2003
Messages
5
Location
US
I have a catch basin discharging into a stone trench through a pipe. The trench is sized for the 2 year storm. Any greater storm is supposed to fill the trench and then overflow through the top of the catch basin. Is there a way to set a maximum elevation in the trench so that once the elevation is reached, it will overflow the top of catch basin. Or maybe another way to model this.
Thanks
 
The easy solution is to model the CB+Trench as a single pond. The storage would consist of the stone-filled trench (primatoid with appropriate voids), and perhaps a vertical cylinder for the CB storage. You can use a horizontal orifice or weir for the CB overflow, and perhaps exfiltration for the trench.


Peter Smart
HydroCAD Software
 
Thanks for the info.
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor

Back
Top