Khansahib
Chemical
- Nov 24, 2006
- 62
The well fluid at a pressure of 1100 psig and 90 deg F is fed to a scrubber. The gas quantity in the well fluid is 10.5 mmscfd whereas liquid is around 1200 BLPD (oil+water). The part of the gas at 1000 psig is to be used as lift gas whereas around 40% of the gas is to be fed back into production manifold along with the liquid from the scrubber for onward transfer to another platform for proper separation and disposal. The production manifold is being operated at 145 psig. The platform is unmanned and without power. I am sure that there will be hydrate formation in the gas line at the pressure reducing Control Valve as the pressure is reduced from 1100 psig to 145 psig. I also have fear that LCV at scrubber will also choke up due to pressure reduction from 1100 psig to 145 psig. I thought about Methanol injection but in an unmanned facility it is a difficult proposition and would like to avoid. Well fluid does not have enough heat that I can take tubing and wrap around PCV and LCV to keep them warm. I need expert opinion as how to deal with this problem.