4glennb
Industrial
- Jun 5, 2003
- 9
An Authorized Inspection Agency is telling me that when welding openings manufactured from plate (in this case SA516-70 manway into an LPG storage tank) directly to the vessel shell or head per Figure UW-16.1(i) that act as a integrally reinforced opening that is calculated as an optional type flange per Appendix 2 must also meet the requirements of UW-13(f) (1) and (2) for material testing. I am arguing that the nozzle is not a Hub type flange as described in UW-13(f) and that it is not used for tubesheet applications as described in appendix 20 therefore does not require test specimen per Fig UW-13.3. Has anyone encountered this problem before??