Jarlath
Mechanical
- Oct 15, 2007
- 4
I am relatively new to UGS and the company I work for is just upgrading from NX 2.0 to NX 5.0. We utilize TCE as well.
In UGS 2.0 we have a Master Dataset which is used for the 3D model, and create a Part Dataset for the drawing files (named the same with '-DWG' appended to the name).
Upon the opening of the "dwg" dataset, the orginal master dataset was inserted automatically as the initial component part (NX2). Does anyone know what we need to do in order to set this up for NX 5.0 & TC?
All our items are created and assigned P/N in TC, not in NX.
In UGS 2.0 we have a Master Dataset which is used for the 3D model, and create a Part Dataset for the drawing files (named the same with '-DWG' appended to the name).
Upon the opening of the "dwg" dataset, the orginal master dataset was inserted automatically as the initial component part (NX2). Does anyone know what we need to do in order to set this up for NX 5.0 & TC?
All our items are created and assigned P/N in TC, not in NX.