NX manufacturing: how to setup tool change time 1

Status
Not open for further replies.

Voran

Mechanical
Jul 13, 2011
6
Hello,

I am new to this forum, so hello to everybody.

Please let me know how to change the default tool changeover time in nx manufacturing, so the time calculations of my operations will be accurate. I am using NX7.5

Thank you.
 
Replies continue below

Recommended for you


Where are you looking at the time?

The value on the operation navigator cannot be changed as far as I know.

In post builder on the tool change event you can set the time.



John Joyce
N.C. Programming Supervisor
Barnes Aerospace, Windsor CT
NX6.0.5.3
 
 http://files.engineering.com/getfile.aspx?folder=002e4e22-1733-4fdd-8438-1e2760399149&file=tool_change_event.gif
Cool - Thanks!

John Joyce
N.C. Programming Supervisor
Barnes Aerospace, Windsor CT
NX6.0.5.3
 
Note that if you have a machine in your setup, the time is not shown in the machine editing dialog because the time is set in the post for the ISV model.

Mark Rief
Product Manager
Siemens PLM
 