Voran
Mechanical
- Jul 13, 2011
- 6
Hello,
I am new to this forum, so hello to everybody.
Please let me know how to change the default tool changeover time in nx manufacturing, so the time calculations of my operations will be accurate. I am using NX7.5
Thank you.
I am new to this forum, so hello to everybody.
Please let me know how to change the default tool changeover time in nx manufacturing, so the time calculations of my operations will be accurate. I am using NX7.5
Thank you.