coolniks37
Mechanical
- Feb 7, 2013
- 85
I have a pipe, which after manufacturing, got hydrotested at 1.5 times design pressure as per ASME
Then it was erected, with the total piping and got hydrotested at site at 1.5 times again.
Now due to some modification, this pipe was modified. Again it is shop and site hydrotested?
My question is what happens to the metallurgy and stres,when u do multiple hydrotest.
Is there any limit on maximum times, a component can be hydrotested?
is it safe to do repeated hydrotests?
Then it was erected, with the total piping and got hydrotested at site at 1.5 times again.
Now due to some modification, this pipe was modified. Again it is shop and site hydrotested?
My question is what happens to the metallurgy and stres,when u do multiple hydrotest.
Is there any limit on maximum times, a component can be hydrotested?
is it safe to do repeated hydrotests?