Per section VIII Div 1 the first circumfrential joint falls under section VIII's juristiction.
No, this is not correct. The weld prep does not the weld joint. Read below.
Please read Section VIII, Div 1, U-1(e)1 ;
U-1(e) In relation to the geometry of pressure containing
parts, the scope of this Division shall include the
following:
U-1(e)(1) where external piping; other pressure vessels
including heat exchangers; or mechanical devices, such
as pumps, mixers, or compressors, are to be connected to
the vessel:
(a) the welding end connection for the first circumferential
joint for welded connections [see UW-13(g)];
(b) the first threaded joint for screwed connections;
(c) the face of the first flange for bolted, flanged
connections;
(d) the first sealing surface for proprietary connections
or fittings;
The weld prep for the tie in welds are under the scope of Section VIII, Div 1. The connection welds are not under the scope of ASME Section VIII, Div 1. These welds fall under a piping code or other specification.