Hi everybody
During the excavation for a mat foundation, we encountered a wrong excavation elevation by the surveyer for approximately 50% of the area. So, we recommended the contractor to continue the excavation with correct elevation until we solve the extra excavated area. The elevation difference is about 2.15m. Please any help.
During the excavation for a mat foundation, we encountered a wrong excavation elevation by the surveyer for approximately 50% of the area. So, we recommended the contractor to continue the excavation with correct elevation until we solve the extra excavated area. The elevation difference is about 2.15m. Please any help.