Hi all,

I have been doing pushover analysis with the plastic hinge definition as per ASCE 41:13. The model is distributed mass OMRF model. 6 storied, 4x4 bay with 5mx5m bay width, 3.5m storey height.
I have uploaded the SAP file.

The problem is " I am getting a lot of null steps and only 3 out of 100 steps are getting saved". I think there is some convergence issue but i unable to solve it by trial and error. Please help me to crack this.

Thanks in Advance.




Ravi K
 
 https://files.engineering.com/getfile.aspx?folder=5c8e965c-bce7-4ab4-8f2e-f0cab2d3aea4&file=Pushover_analysis_5x5.sdb
Is it possible to get negative base shear in pushover analysis ?

And why are the hinge results so random for M2 and M3 hinges ?

How pushover curves are related to hinge backbone curve ?

Ravi K
 
 https://files.engineering.com/getfile.aspx?folder=49904739-8f9f-41a6-b93e-f37ae5e0f380&file=SAP2000_19.2.pdf
Can you confirm that the control joint is on the upper floor?

Jason McKee
proud R&D Manager of
Cross Section Analysis & Design
Software for the structural design of cross sections
Moment Curvature Analysis
Interaction Diagrams
Reinforcement Design etc.
 
Yes,Jason McKee, The control point is upper floor.

Ravi K
 
Whenever i conduct some pushover analysis in SAP2000, the result do not converge. Only in few cases, I can complete the analysis with any problem. What may be the problem behind this ?

Ravi K
 