Simply using the same size everything does not matter.
Are the branch lines being added, adding to the remote distance? If so, hydraulic calcs are in order. This then becomes the same as a full new system submittal in a sense. In any case, the items outlined in NFPA #13 must be accounted for in your drawing. Reference Chapter 22, section 22.1.3.
R/
Matt