LuffyD
Petroleum
- Aug 13, 2010
- 2
NFPA 59A requires 30%RT butt welds ( above -29C) as per 9.7.3.2 (B) Pressure piping operating above ?20°F (?29°C) shall have 30 percent of each day’s circumferentially welded pipe joints nondestructively tested over the entire circumference, in accordance with ASME B 31.3.
1- is Fuel Gas service(same composition/pressure than Feed gas) falls under this requirement ?
code looks confusing.
in one hand , all HC pipings should follow NFPA 59A in LNG plant
as per 9.2.1.1
and in the other hand 9.2.1.2 Fuel gas systems shall be in accordance with NFPA 54, National Fuel Gas Code, or ASME B 31.3, Process Piping.
nfpa 54 Exept FG for LNG from its scope.
so the question is : FG should have 5%RT butt weld as B31.3 or 30%RT as any HC withing LNG plant.