In similar situations I have always treated them as new.
I have always talked to the AHJ and asked them what they wanted.
They have always wanted it treated as new and it made sense to me.
Call the electrical section of the building department in the location of the job. Talk to the chief electrical inspector. Ultimately that's where your answer will come from, better to find out now as later.