corem16
Mechanical
- May 26, 2010
- 6
Good morning,
My name is Thiago Mello, I am an mechanical engineer specialist in piping from a big company in Brazil and I have a huge problem that I like to share with my professional colleagues.
Our company, which is specialized in Downstream, has several capital projects being implemented. It had been identified that fabrication and installation of piping systems represents 40% of the amount of workmanship in a petrochemical project, and, to be more specific, fabrication and installation of small diameter pipes had been causing problems to our schedule projects (because of great quantity of welding that have to be done), due to the fact that is always the last to be installed. I would like to know if there is any new fabrication or installation process that could be more productive?
I would like to hear comments/suggestion from you.
Regards.
Thiago Mello
My name is Thiago Mello, I am an mechanical engineer specialist in piping from a big company in Brazil and I have a huge problem that I like to share with my professional colleagues.
Our company, which is specialized in Downstream, has several capital projects being implemented. It had been identified that fabrication and installation of piping systems represents 40% of the amount of workmanship in a petrochemical project, and, to be more specific, fabrication and installation of small diameter pipes had been causing problems to our schedule projects (because of great quantity of welding that have to be done), due to the fact that is always the last to be installed. I would like to know if there is any new fabrication or installation process that could be more productive?
I would like to hear comments/suggestion from you.
Regards.
Thiago Mello