Hi,
A new one story addition (penthouse and elevator extension) is proposed over the top of 4-story building. Do any of you know where I can find any restrictions on erecting steel over a building that is occupied during the day ? One of GCs said 2 floors below shall be empty by code or heavy duty roof protection (300psf) to be installed when the floor below is occupied..What if erection takes place at nights and weekends..? I'd appreciate any thoughts or references.
A new one story addition (penthouse and elevator extension) is proposed over the top of 4-story building. Do any of you know where I can find any restrictions on erecting steel over a building that is occupied during the day ? One of GCs said 2 floors below shall be empty by code or heavy duty roof protection (300psf) to be installed when the floor below is occupied..What if erection takes place at nights and weekends..? I'd appreciate any thoughts or references.