We have a DN800 water pipeline installed adjacent to a road. There is a requirement to put an additional DN1200 water pipeline running parallel to the DN800 pipeline.
What is the minimum distance to allow between the pipelines or from the existing trench?
We have to do the usual surveys etc but for now as an approximate hydraulic calculation will run as close as possible to the existing pipeline subject to further studies including constructability.
Regards
John
What is the minimum distance to allow between the pipelines or from the existing trench?
We have to do the usual surveys etc but for now as an approximate hydraulic calculation will run as close as possible to the existing pipeline subject to further studies including constructability.
Regards
John