shacked
Structural
- Aug 6, 2007
- 182
The company that I work for does a lot of residential remodels, therefore new shearwalls need to be installed to replace the existing shearwalls that are being removed.
This new ACI cracked concrete code and all of the calculation is total BS.
So if I perform all the calculations that the new code requires based on the old edge distance & other values that worked before with Simpson SET epoxy, it does not work.
So are all the data and tests that Simpson did false? Is this a total academic formula that has no bearing on actual "real world" situations?
Any comments into the intent of ACI 318, 308 would be appreciated.
This new ACI cracked concrete code and all of the calculation is total BS.
So if I perform all the calculations that the new code requires based on the old edge distance & other values that worked before with Simpson SET epoxy, it does not work.
So are all the data and tests that Simpson did false? Is this a total academic formula that has no bearing on actual "real world" situations?
Any comments into the intent of ACI 318, 308 would be appreciated.