As far as cleanouts go, your forcemain should be designed to provide a minimum velocity of 2.5 fps. This is done in order for the flow to scour out the pipe on each pump.
Cleanouts are not typically installed. I've designed forcemains with lengths of 30,000 feet. As long as the velocity is sufficient, you should not have problems with clogging.