In one of the Power plant projects, 11kV system is used with solid grounding. Now Black start diesel generator needs to be connected to the same system as stand-by. Both systems need to be operated in parallel during change-over operation. In this case, we would like to use low impedance grounding to new stand-by diesel generator neutral. Please discuss pros and cons.
Advanced Thanks..
In one of the Power plant projects, 11kV system is used with solid grounding. Now Black start diesel generator needs to be connected to the same system as stand-by. Both systems need to be operated in parallel during change-over operation. In this case, we would like to use low impedance grounding to new stand-by diesel generator neutral. Please discuss pros and cons.