OzCalvin
Electrical
- Nov 7, 2005
- 1
Hi,
I have a flow being measured by two transmitters. The high flow is covered by the high range transmitter FIb. The low flow is covered by the low range transmitter FIb. What would be the best way to build this in a control network database using logic so that I get one flow indication and:
1. transition from one transmitter to another transmitter is smooth.
2. bad PV of any transmitter is handled correctly (like hold last good value).
Thanks,