NewbieInSE ,
Apparently the sketch that you have posted got from web (e.g.
) and you added 4 in embedment and 3 in extra clear cover...
I think everybody will agree to provide embedment in the range of 4 in. but the approach differs for the requirement of extra 3 in. In my region, the common practice is , to provide 100 mm embedment and spacer around 25 mm above the pile.
I suspect, the extra 3 in. is provided if the pile cap is analyzed with STM . If the depth of triangular bottom node is wt, the tie depth would be wt/2 above the top of pile.
This excerpt from ( Strut-and-Tie Models for Unified Design by Chen, W.F. )
And this is excerpt from worked example ACI SP-17(14)
And the following is the same pile cap obtained from sectional design.
I will prefer to install the rebars 25 mm above the pile top and all the bars bent 90 degr.,extent to get the required development length rather than simple hook .And provide minimum cage reinf and horizontal ties for bursting reinf.