power2engineer
Electrical
- May 18, 2003
- 53
I have a situation with 2 PV systems each roughly 250KW and BESS (Battery Energy storage system) at customer site we are trying to connect to Utility grid. Would an utility approve such connections with Multiple points of disconnections ? Simplified one line in included/