eng003
Structural
- Jan 4, 2012
- 67
For a typical continous multiply 2x wood beam I often see detailed lag or through bolts staggered. The required fastening to develope the plys on either side of splices at zero moment is not somehting I would typically try to quantify exactly ( I would opt to over do it) but I am questioning whether this fastening schedule is really needed. I wouldn't care but when you finishing out a beam that will be sean it would be nice to use just nails or smaller countersunk structural screws. Any comments and thoughts on how to easiliy check a fastening schedule.