Statesman
Mechanical
- Jul 26, 2002
- 15
Hello,
In Project how do you attach resources to a task ?
Example: One of my tasks involves draughting and checking. If I have the one task (Draughting of component) which will take 15 man-days draughting and 4 days Engineering checking. How do I assign those to it ? If I want to add more than one designer to it, (say 3 to reduce the time taken to 5 days) How do I do that ? Do I say my designer resources are 300%. Sorry if this is a bit simple, I am fine at laying out the plans (SS+3etc). but have never been involved with the resource allocation before.
In Project how do you attach resources to a task ?
Example: One of my tasks involves draughting and checking. If I have the one task (Draughting of component) which will take 15 man-days draughting and 4 days Engineering checking. How do I assign those to it ? If I want to add more than one designer to it, (say 3 to reduce the time taken to 5 days) How do I do that ? Do I say my designer resources are 300%. Sorry if this is a bit simple, I am fine at laying out the plans (SS+3etc). but have never been involved with the resource allocation before.