Aug 30, 2014 #1 marclegerstee Mechanical Joined Jan 6, 2012 Messages 4 Location AE Is it mandatory to preform MPI after flame cutting, according AWS?
Sep 16, 2014 #2 Duwe6 Industrial Joined Jul 27, 2010 Messages 2,189 Location US Not per AWS - assumes proper preheat of the region prior to cutting. AISC requires MT of coped areas on 'Jumbo' [very thick & heavy] sections, IIRC. Upvote 0 Downvote
Not per AWS - assumes proper preheat of the region prior to cutting. AISC requires MT of coped areas on 'Jumbo' [very thick & heavy] sections, IIRC.
Sep 16, 2014 #3 gtaw Structural Joined Feb 10, 2006 Messages 1,988 Location US You might want to read AWS D1.1:2010, clause 5.17.3 regarding flame cut access holes. There is a requirement for MT or PT if the flange or welded section is thicker than 2 inches. Best regards - Al Upvote 0 Downvote
You might want to read AWS D1.1:2010, clause 5.17.3 regarding flame cut access holes. There is a requirement for MT or PT if the flange or welded section is thicker than 2 inches. Best regards - Al