jlbmech
Mechanical
- Aug 21, 2005
- 59
Working in SE20 and I have a problem. I have parts in a top level assembly, but I need them to be in one of the subassemblies. Is there a way to move them from one to the other without having to erase them from one and redo in the other?
Thanks
SE v20 SP7 WinXP SP2
Thanks
SE v20 SP7 WinXP SP2