Awhile back I posed this question. Scotty uk replied, but I never could pull up his comments, so I'll try again, and this time I'll leave my e-mail address for replies. I have an insulation machine which uses two 13 amp industrial blower motors and one 15 amp 1 hp drive motor. Because of the spike on startup, I have to use a 17 kw generator which is large and heavy to be hauling around to our jobs. If I were to use time-delays of say a half second on each motor, would that be sufficient to be able to down-size my generator to a more manageable 8 kw? Also, how can I measure the duration of the spike so I get the correct delays, and where would I get these delays? I'm figuring 13+13+15 amps X 120 volts = 4,920 watts being what is actually necessary to run these motors. Hope I'm barking up the right tree. Any info would be extremely useful! Thanks a lot! Larry