Hello All,
I asked a consultant to do a arc flash study on a 1600 A 120/208 switchboard. Unit has molded case circuit breakers with
Schneider Micrologic 6.0 P trip unit. i need some input in testing these breakers for commissioning using primary injection.
I will not be testing it myself but just curious if I pick some two test points on long time curve for field crew to test, how would the heating of 1st test point impact the results/timings of second point on the curve.
Any tips to address this issue.