ConstantEffort
Mechanical
- Dec 29, 2012
- 72
A client decided ex post facto to increase the wind design criteria. The tower has already shipped to the client, but no foundation has been poured yet. What miracle solutions can anyone recommend for this situation?
The vessel has a compression ring baseplate arrangement which is the only component which fails our normal criteria due to too much compressive stress. The options we're currently floating around:
1. Increase the compression ring design stress based on the materials minimum specified yield strength compared to the higher value indicated by the CMTR.
2. Increase the compression ring thickness
The vessel has a compression ring baseplate arrangement which is the only component which fails our normal criteria due to too much compressive stress. The options we're currently floating around:
1. Increase the compression ring design stress based on the materials minimum specified yield strength compared to the higher value indicated by the CMTR.
2. Increase the compression ring thickness
A. by cutting off the old and installing a new
B. by adding an additional loose ring on top as a sort of washer