gwool
Civil/Environmental
- Apr 18, 2006
- 14
I have a situation in which each of 3 subcatchments drains through a respective culvert and into a 4th subcatchment, and then that 4th subcatchment drains through a 4th culvert. This 4th basin is a large flood plain and would fill in during larger events. When this happens, the "reach" (trapezoidal section) fills in and I get an error message saying that the (4th) culvert exceeds the reach inflow depth by 1.96 feet (warning message #63). Intuitively, it makes sense that the reach would fill in, and then the entire subcatchment would continue fill in. Do I seem to have modeled this situation correctly? It's an existing-conditions model.