TerraSouth
Civil/Environmental
- Aug 13, 2005
- 53
I have a two stage weir.
The first stage is designed to handle the 25 year event.
For purposes of discussion, let's say that this weir is a broad crested rectangular weir, 6 foot wide, at elevation 100.
The second stage is designed to handle the 100 year event. It is 12 foot wide, at elevation 102.00.
When setting up this situation which weir would be the primary weir and which is device #1?
What's the correct way to model this situation?
Thanks
The first stage is designed to handle the 25 year event.
For purposes of discussion, let's say that this weir is a broad crested rectangular weir, 6 foot wide, at elevation 100.
The second stage is designed to handle the 100 year event. It is 12 foot wide, at elevation 102.00.
When setting up this situation which weir would be the primary weir and which is device #1?
What's the correct way to model this situation?
Thanks