Tomfh
Structural
- Feb 27, 2005
- 3,592
I am repaving around my pool. The minimum gradient I would ordinarily specify (1%) is going to be a hassle. It makes it hard to reach drain points. What's the realistic minimum I can get away with? Will 0.5% be ok? The pavement runs are 10m. So 50mm over 10m...
The subbase is well consolidated. It's not going to move much from here on.
The subbase is well consolidated. It's not going to move much from here on.