Feb 20, 2006 #1 obede Computer Joined Feb 6, 2006 Messages 4 Location BR Hi dear I configured the working time to 8 hrs/day and I created tasks with less than 8 hrs. Why doesn't the milestone duration match the sum of taks? Thank you very much Obede Brazil
Hi dear I configured the working time to 8 hrs/day and I created tasks with less than 8 hrs. Why doesn't the milestone duration match the sum of taks? Thank you very much Obede Brazil
Mar 23, 2006 #2 LarryBud Military Joined Dec 3, 2003 Messages 1 Location US By defintion a milestone has a duration of 0. Upvote 0 Downvote