I am doing a steel railway bridge which carries 2 heavy rail tracks and spans over 3 tracks at 7.5m below the bottom of the bridge (in the midspan region). For a span / depth ratio of 10, the steel truss might be 8m deep.
Could any bridge guys propose some practical solution of erecting this structure?
(e.g. Cut the bridge into several pieces and get spliced on site and slide into position by launching…….).
There is a restriction: No permanent columns can be constructed around the 3 tracks.