projectEST
Civil/Environmental
- Mar 5, 2007
- 15
HELP!! Im very unfamiliar with the driving of H-Piles, but I must submit a means and methods procedure to the owner for driving H-Piles.
There will be 162 piles @ 30' that will drive 25' through soil and 5' through rock.
The rock we will hit is serpentine rock which contains traces of asbestos (oh no!)
The procedure must consist of driving techniques, rock augering...
Anyone have any info for me it will be greatly appreciated.
Joe
Project Engineer
There will be 162 piles @ 30' that will drive 25' through soil and 5' through rock.
The rock we will hit is serpentine rock which contains traces of asbestos (oh no!)
The procedure must consist of driving techniques, rock augering...
Anyone have any info for me it will be greatly appreciated.
Joe
Project Engineer