My situation is a custom lot subdivision with no lot grading. One lot has a natural swale running through it and the county wants an MDE to assure the drainage flow will not ever be blocked. The problem is the swale runs down the middle of the lot. The MDE would make the lot un-buildable. Is there an alternative to encumbering the lot this way but still assure the drainage will always have a path somewhere through the lot?