Typically for the process improvement or upgrade, the alternative option is to reuse the existing vessels for the process conditions higher than the current design. In this case, one may check it with the allowable pressure condition with an established safety factor by Code. You may push it to the 90% of the yield strength if you have a good reason for it, and of course, by taking a potential risk.
IMO, there is no need to go over this limit since no one, both Engineer and Client, will take the responsibility for it.