Downhand
Industrial
- Dec 20, 2009
- 59
Do any of the North American codes state the minimum amount of weld that needs to be deposited on a pipe joint before it can be left overnight? As well, do any of the North American codes state a maximum amount of time that a weld can be left without being fully completed? Let's say a welder is eighty percent complete and an emergency comes up, can the weld be left for a few weeks before it is completed or is there a maximum amount of time that it can be left uncompleted before it must be cut out?