The material selection for any equipment is determined by the Process Engineer and the Materials Engineer.
If deviation from the specified material is detected in RFQ & Quotation, then the RFQ has to be revised to correct the error and the tenderers shall be advised to follow the mentioned correction. Also, if such a gross mistake has been detected in the RFQ, the people who signed the document should be questioned.
Cheers,
gr2vessels