hokie66, I agree with your sequence, although I would expect the contractor to have two (2) crews that start at opposite ends and meet in the middle. I'm in Texas and the foundation was suppose to be cast back in February, which was probably ideal here, but April temperatures will be a toss up.
I know this is more of a means and methods issue, so I do appreciate your input. I like to be somewhat educated on which means and methods Don't Work, so I can express concerns if they are proposed.