Hello All,
I have attached two drawings that I would like to hear some opinions on. Drawing 1 was created by someone in our engineering department here in the US and drawing 2 was created by a colleague in Germany. Our German engineering team is requesting that we follow the same methods. Personally while I have some critique for both drawings the second to me is incorrect (cluttered, too many sig. figs, not drawn with engineering intent in mind, etc). I understand that they are creating it for a manufacturer who does not use modern software so they manually program the CNC. In this specific case it could make sense to perhaps create a supplemental sheet but it should not drive the way all drawings are created. As a note we are a European company so drawings are metric and First angle projection.
I have attached two drawings that I would like to hear some opinions on. Drawing 1 was created by someone in our engineering department here in the US and drawing 2 was created by a colleague in Germany. Our German engineering team is requesting that we follow the same methods. Personally while I have some critique for both drawings the second to me is incorrect (cluttered, too many sig. figs, not drawn with engineering intent in mind, etc). I understand that they are creating it for a manufacturer who does not use modern software so they manually program the CNC. In this specific case it could make sense to perhaps create a supplemental sheet but it should not drive the way all drawings are created. As a note we are a European company so drawings are metric and First angle projection.