There is a vertical pressure vessel with 4.5 bar operating pressure.Orientation of Man-hole over this pressure vessel is incorrect.Purchaser wants to change the location of the man-hole due to its impassable entrance.which one of the following ways for closing the hole of the man-hole is correct?
1-Patching over the hole after cutting out the Flange?
2-Blinding the Man-hole?
3-Inserting new plate after cutting out of previous one from its welding lines?
Please let me know the remedy action as per relevant standards.
Thanks in Advance
1-Patching over the hole after cutting out the Flange?
2-Blinding the Man-hole?
3-Inserting new plate after cutting out of previous one from its welding lines?
Please let me know the remedy action as per relevant standards.