The V4 command is SOLIDE/CREATE/IMPORT.
Requirements:
1)the solid to be imported must first be PUBLISHed. Right mouse click on the tree and select PUBLISH.
2)the solid must be in a PASSIVE model in the current session.
Caution- the link to the casting will be damaged (yes, it can be easily repaired) if
1) the donor model's name is changed
2) or the donor's directory is changed
3) or the donor model is deleted
We use a sequenced chain of imports to show the manufacturing phase linkage between models.