Well, we are talking about only 2 m3 (70 ft3), so it's relatively very small volume. If the emergency is not fire, I would'nt bother depressurising it. But what are you going to do with the vessle upstream of this pipe, where the LPG is coming from?
I would guess this LPG stream is an overhead stream of a tower, in which case you would probabely want to depressurise the whole column. So you could also take this line with the same column and depressurise at the same time.