Looking for freeze pane capability in MS Project

Status
Not open for further replies.

dccampbell

Mechanical
Joined
Jun 15, 2004
Messages
1
Location
US
I have close to 1000 tasks, all leading up to a single event. As I alter the schedule, I have to keep scrolling way down to see if the end-date changed. Is there any way to have a task always show up, like freezing panes in Excel?

Thanks.
 
Why not just open up another window and tile the two?

TTFN
 
Alternatively, if you know the ID number, use GoTo - Control G - then you don't have to scroll at all.
 