GTRgearing
Mechanical
- Jun 14, 2004
- 1
Application: 300 ft + of cable run between a 460v VFD and a 1/8hp gearmotor. 2 of each gearmotor and drive powering a mobile device. Obviously, motor protection, such as a line reactor is required. But, do they have to be located next to the motor? Are there any new, smaller devices out there? The mobile device is small and real estate is at a premium.
Any suggestions?
Any suggestions?