Are there any guidelines on what loads to use when load testing a concrete beams (post-tensioned beam). I am inclined to use the factored design loads. Something tells me I should use the service loads (unfactored loads) and somehow I also feel I should even increase the factored loads further. I do not want to reach failure. This is proof testing. Any thoughts?