structuralaggie
Structural
- Dec 27, 2006
- 198
I am working on a cantilever retaining wall that has seismic loading that was provided by the Geotech. Looking at stability and the load combination 0.6D+0.7E+H from ASCE7, is it appropriate to reduce E and H by the same amount that D is since they are both functions of D?