GeoGrouting
Civil/Environmental
- Jun 24, 2007
- 65
Closed end Steel pipe piles were driven in soft silt/clay (14 m and followed by medium dense sand to 17 m. The 5000 Ibs hammer with a fall of 3ft was used. The blow counts changed from 5/ft to 20/ft for the last 2-3 ft of penetration. What is the best estimate of pile tension loads and compression loads. What formula would be suitable.