I'm running an 1 1/2" schedule XS 304L SS pipe to carry liquid nitrogen (-320 deg Fahrenheit) to an injection quill at a reactor.
What is the recommended maximum span (between supports) for the 1 1/2" line?
What is the recommended maximum span (between supports) for the 1 1/2" line?