mayjark
Mechanical
- Jul 24, 2019
- 3
Hi,
I just want to ask if my computation is correct for this situation.
I have an Actuator coupled with a gearbox and lifting a gate vertically using screw thread (ACME).
Gate height - 2.5 meters
SCREW THREAD - 3 TPI (ACME), 38mm dia.
Gearbox ratio - 4:1
Gearbox torque capacity - 600 ft lbs
Thrust capacity - 40000 lbs
Actuator output rpm - 73
Rated output torque - 100 ft-lbs
My computations is: Lifting speed = (actuatorRPM * efficiency / (gear ratio * TPI)
efficiency = 90 percent
So using the formula I get 5.48 inches per minute, am I correct on this?
Thanks in advance
I just want to ask if my computation is correct for this situation.
I have an Actuator coupled with a gearbox and lifting a gate vertically using screw thread (ACME).
Gate height - 2.5 meters
SCREW THREAD - 3 TPI (ACME), 38mm dia.
Gearbox ratio - 4:1
Gearbox torque capacity - 600 ft lbs
Thrust capacity - 40000 lbs
Actuator output rpm - 73
Rated output torque - 100 ft-lbs
My computations is: Lifting speed = (actuatorRPM * efficiency / (gear ratio * TPI)
efficiency = 90 percent
So using the formula I get 5.48 inches per minute, am I correct on this?
Thanks in advance